Nadico’s technical consulting reduces the risk of an industrial investment before it is committed: we audit land and assets, verify planning and financial feasibility and plan the project so that the decision to buy, lease or build is taken on verified data. It is the natural first step before our industrial engineering and architecture projects.
Consulting services for developers, funds and industry
Planning and financial feasibility studies
We analyse the planning rules that apply to the plot (land classification and zoning, buildable area, site coverage, heights, compatible uses, land transfers and charges), the access and the available utilities, and cross them with the client’s schedule of requirements. The result is a report stating what can be built, with what floor area and at what approximate cost, and which procedures drive the timeline.
Technical Due Diligence (TDD)
Before acquiring an industrial or logistics asset, we inspect the building and its installations, review the technical and administrative documentation (permits, installation licensing, certificates, periodic inspections) and quantify the investments required in the short and medium term. The TDD identifies hidden liabilities, such as asbestos-cement roofing, unlicensed installations or activities without a licence, that change the price or the terms of the deal.
Site layout and location studies
We compare alternative locations or plant layouts for an industrial or logistics process: material flows, floor areas, future expansion, fire safety and classified activity regulations. The layout study sets the starting point for the preliminary design.
Inspection and technical assessment of existing buildings
Condition assessment of the structure, envelope, floors and installations, using thermography, photogrammetry and drone inspection where access is difficult. It concludes with an action plan prioritised by urgency and cost.
Dealings with the authorities
Preliminary planning enquiries, compatibility certificates, coordination with local councils, environmental bodies, the industry authority and utility companies. We know each authority’s real procedures and lead times, which avoids surprises in the project schedule.
Project scheduling
An integrated schedule of permits, design, tendering, construction, licensing and commissioning, with milestones and identified risks. The schedule is kept alive throughout the life of the project.